CPS Is At It Again

CPS Is At It Again

composite-panel-install

Every contractor in Northern Wisconsin becomes a gambler in March as you never know what Mother Nature has in store from one day to the next. On this day it may have taken longer to back the truck into the job-site than to install the 124 lineal feet of Foundation Composite Wall. General Contractor Jim Russell was so amazed with the install that he said “don’t ever sell this product, you have a bonafide winner here”. The entire composite basement was erected and waterproofed in under two and a half hours and Mr. Russell vowed that he will be seeing us again!

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*